Aluminum Alloy Flood Barrier

Aluminum Alloy flood prevention water barrier Introduction

Material: 6063T 5 aluminum alloy, 2 mm plate thickness

Thickness: 40mm (hollow, with reinforcement in the middle)

Length:Customized according to customer requirements

Height:Single   sheet  20cm,  can  be  customized  according  to  customer requirements

Color: Silver (aluminum alloy base color). Additional paint job required for other colors.

Sealing performance: The bottom of the water barrier plate, the connection between the plates, and the connection between the plates and the column are all equipped with  sealing  strips. The bottom  strip is made of EPDM foam, and the other strips are made of silicone

Service life: The service life of the flood barrier (excluding the rubber strip) is 25-30 years, the bottom rubber  strip is  6-8 years,  and the silicone material is 8-10 years.

Product features:

1 、 It  provides  excellent  airtight  and  waterproof  performance,  effectively preventing  floodwater  intrusion  during  rainy  seasons  to  avoid  property damage.

2 、 The mold is formed in one piece, offering an elegant appearance with a uniform surface, and can be customized with the company logo.

3 、 The structure is robust, featuring fixed side columns and a central column. The triangular back support achieves excellent mechanical performance.

4 、 The  waterstop  strip  is  molded  from  EPDM  (ethylene  propylene  diene monomer) rubber, while other accessories are fabricated from 304  stainless steel through integral molding.

5 、 Easy to use,  1-2  people can complete the installation and disassembly process in 5-10 minutes.

6 、 Flexible operation with prompt emergency response

7 、 The system is maintenance-free and comes with lifetime technical

support.

Main application:

Water-blocking boards are ideal for flood prevention, especially  in  flood-prone  areas  like  underground parking  entrances,  subway exits, private garage doors, factory or office gates, warehouse entrances, hydropower stations, and villa garages. Widely used in such locations, they effectively prevent rainwater infiltration during seasonal flooding.

The steps are as follows:

Installation video

First,secure the neutral column to the pre installed embedded components using a hex wrench (omitted if no neutral column is  present).  Next,   position  the  floodwater  barrier   plates  in  parallel alignment  according  to  the  water  level   sequence  (starting  from  the bottommost plate), then fasten them in place. Install the top clamping component and tighten the hex screws on both the top and column sides using a hex wrench until the screws become immovable under adult hand pressure. When tightening the  column  screws,  start  from  the  top  and proceed  to  the   sides,  ensuring  the   screws  are  tightened   in  parallel sequence.