Aluminum Alloy flood prevention water barrier Introduction
Material: 6063T 5 aluminum alloy, 2 mm plate thickness
Thickness: 40mm (hollow, with reinforcement in the middle)
Length:Customized according to customer requirements
Height:Single sheet 20cm, can be customized according to customer requirements
Color: Silver (aluminum alloy base color). Additional paint job required for other colors.
Sealing performance: The bottom of the water barrier plate, the connection between the plates, and the connection between the plates and the column are all equipped with sealing strips. The bottom strip is made of EPDM foam, and the other strips are made of silicone
Service life: The service life of the flood barrier (excluding the rubber strip) is 25-30 years, the bottom rubber strip is 6-8 years, and the silicone material is 8-10 years.
Product features:
1 、 It provides excellent airtight and waterproof performance, effectively preventing floodwater intrusion during rainy seasons to avoid property damage.
2 、 The mold is formed in one piece, offering an elegant appearance with a uniform surface, and can be customized with the company logo.
3 、 The structure is robust, featuring fixed side columns and a central column. The triangular back support achieves excellent mechanical performance.
4 、 The waterstop strip is molded from EPDM (ethylene propylene diene monomer) rubber, while other accessories are fabricated from 304 stainless steel through integral molding.
5 、 Easy to use, 1-2 people can complete the installation and disassembly process in 5-10 minutes.
6 、 Flexible operation with prompt emergency response
7 、 The system is maintenance-free and comes with lifetime technical
support.
Main application:
Water-blocking boards are ideal for flood prevention, especially in flood-prone areas like underground parking entrances, subway exits, private garage doors, factory or office gates, warehouse entrances, hydropower stations, and villa garages. Widely used in such locations, they effectively prevent rainwater infiltration during seasonal flooding.
The steps are as follows:
Installation video
First,secure the neutral column to the pre installed embedded components using a hex wrench (omitted if no neutral column is present). Next, position the floodwater barrier plates in parallel alignment according to the water level sequence (starting from the bottommost plate), then fasten them in place. Install the top clamping component and tighten the hex screws on both the top and column sides using a hex wrench until the screws become immovable under adult hand pressure. When tightening the column screws, start from the top and proceed to the sides, ensuring the screws are tightened in parallel sequence.

